Wind

family of computer operating systems developed by Microsoft

🔗 Connections

Foundation Date

Foundation Year Bucket

🎨 Color Analysis

Color Tone

👁️ Visual Attributes

👤 Human Attributes

Official Websites

Promotion Insights

Color Analysis

Statistics computed across 528 images

ColorMean
Light Blue31.5%
White24.5%
Mud Green24.4%
Gray23.2%
Blue21.8%
Black21.6%
Dark Blue19.8%
Royal Blue18.3%

Tone Distribution

ToneMean
Warm1.9%
Neutral57.0%
Cool41.2%

Sample Images

Image 1

Image 1

#Vestas has received a 203 MW order to power an undisclosed wind project in the USA. The order consists of 45 x V150-4.5 MW wind turbines. Read more ➡️

Attributes:

  • Caption: A large white wind turbine with Vestas on the top of it.
  • Keywords: wind turbine, Vestas, large, white, propeller, blades, sky, clouds, blue sky, power, energy, green energy, renewable energy, wind farm, windmill, wind power, alternative energy, eco-friendly, sustainable, environmentally friendly, alternative energy source, clean energy, renewable energy source

Image 2

Image 2

We will deliver the EPC contract for the largest Vestas’ onshore wind farm in Asia-Pacific, the 756MW Golden Plains Wind Farm Stage One in Victoria, 🇦🇺🏆: ☑️ 122 V162-6.2 MW™ ☑️ 30-year Service and Maintenance Agreement 🏡 Enough to power ≈450,000 homes

Attributes:

  • Caption: Several windmills on a hill in the distance
  • Keywords: windmills, hill, distance, cloudy sky, grassy field, landscape, outdoors, nature, power, energy, green, blue, white, wind, turbine, renewable, environment

Image 3

Image 3

We will deliver the EPC contract for the largest Vestas’ onshore wind farm in Asia-Pacific, the 756MW Golden Plains Wind Farm Stage One in Victoria, 🇦🇺🏆: ☑️ 122 V162-6.2 MW™ ☑️ 30-year Service and Maintenance Agreement 🏡 Enough to power ≈450,000 homes

Attributes:

  • Caption: Wind turbines on a hillside on a cloudy day
  • Keywords: wind turbines, hillside, cloudy, day, sky, blue, grassy, field, power, renewable energy

Image 4

Image 4

Can bureaucracy solve the climate and energy crises? It takes up to a decade to secure permission for a wind energy project. This guide outlines 4 steps global leaders can take to accelerate the approvals needed for new wind energy projects. #COP27

Attributes:

  • Caption: Set Short Firm Deadlines
  • Keywords: firm, deadlines, short, set, set short firm deadlines, short firm deadlines

Image 5

Image 5

Can bureaucracy solve the climate and energy crises? It takes up to a decade to secure permission for a wind energy project. This guide outlines 4 steps global leaders can take to accelerate the approvals needed for new wind energy projects. #COP27

Attributes:

  • Caption: Step 2: Set Short Firm Deadlines
  • Keywords: firm deadlines, short, set, step 2, document, permit, renewable energy projects, ensure, meet

Image 6

Image 6

Can bureaucracy solve the climate and energy crises? It takes up to a decade to secure permission for a wind energy project. This guide outlines 4 steps global leaders can take to accelerate the approvals needed for new wind energy projects. #COP27

Attributes:

  • Caption: Put renewables at the center of the emergency response
  • Keywords: renewable, energy, crisis, climate, emissions, stability, energy markets, economic growth, resilient societies

Image 7

Image 7

Can bureaucracy solve the climate and energy crises? It takes up to a decade to secure permission for a wind energy project. This guide outlines 4 steps global leaders can take to accelerate the approvals needed for new wind energy projects. #COP27

Attributes:

  • Caption: Boost Permitting Resources
  • Keywords: permit, resources, boost, permitting, faster, invest, bureaucracy, skilled people, digitalization, processes, empowered decision makers, turn permitting promises into reality

Image 8

Image 8

The completion of the V236-15.0 MW™ prototype nacelle at the factory in Lindø is the culmination of the great efforts of our #Vestas team. Visit us @WindEnergyHH and learn more about our #offshorewind approach! Vestas at Wind Energy Hamburg 2022:

Attributes:

  • Caption: Two men in a large building with a large machine.
  • Keywords: men, building, machine, large, blue, white, vestas, wind turbine, factory, industrial, manufacturing, assembly line, conveyor belt, turbine, windmill, power, renewable energy, green, environment

Image 9

Image 9

The completion of the V236-15.0 MW™ prototype nacelle at the factory in Lindø is the culmination of the great efforts of our #Vestas team. Visit us @WindEnergyHH and learn more about our #offshorewind approach! Vestas at Wind Energy Hamburg 2022:

Attributes:

  • Caption: Two men looking at a large white Vestas machine.
  • Keywords: Vestas, machine, large, white, men, factory, industrial, production, manufacturing, assembly, workers, engineers, inspectors, maintenance, equipment, assembly line, assembly plant, industrial equipment, industrial machinery, industrial facility, industrial building

Image 10

Image 10

Onshore wind is crucial to help the world transitioning to a renewable energy system. And our brand new V172-7.2 MW can make the difference. Visit us @WindEnergyHH and learn more about our onshore wind approach! Vestas at Wind Energy Hamburg 2022:

Attributes:

  • Caption: A wind farm with many wind turbines in the sky
  • Keywords: wind farm, wind turbines, sky, clouds, trees, green, blue, white, tall, blades, power, renewable energy, eco-friendly, sustainable, environmentally friendly

… and 518 more images

Additional Properties

PropertyValue
Wikidata LinkOpen Wikidata
PropertyValue
Foundation Date1985
Inception1985-11-20
Facebook Idwindows
Twitter UsernameWindows (as of 2018-05-10, from 2008-07-31), WindowsUK (as of 2020-03-25, from 2009-10-14)
Youtube Channel IdUCVGOyzms_XJNk_DHqrffXCw (as of 2020-12-06, from 2008-08-28)
🐛 Report